An exclusive and unparalleled community is coming to the city of Niagara Falls. Parkside39, offers serene park views and greenspace all while being moments away from urban conveniences, shopping, dining, transit, and world-renowned attractions, making it the perfect place to call home for 39 lucky homeowners.
Construction of a new Fire Station that will consist of four “back in” apparatus bays, office and meeting rooms, a fitness center, standard service level kitchen, decontamination facilities. Site work will include new heavy duty and regular duty asphalt drives, storm water management strategies and additions to existing septic systems.
This project includes the expansion of approximately 18,000 sq. ft. to an existing 1-storey school complex. The scope of work includes an addition at each end of the existing building, a new entrance, and interior renovations of the existing school interior. Construction consists of masonry veneer, curtain wall, wood trusses, metal roofing system, metal framing, and concrete block interior walls.
This project includes a park pool replacement and a new addition to a Community Centre building including Mechanical Room, upgrades to HVAC and fencing.
New construction of a 60 unit, 5 storey apartment building in Thorold, ON.
This project includes the construction of the Memorial Park In-Ground Pool, including main pool, wading pool, and a bath house. The scope of work includes demolition of existing concrete pool, wading pool, and bathhouse, new construction recreation pool with new concrete deck and pool accessories, new bathhouse construction will include a 2,800 sq. ft. change facility, public washrooms, and exterior change cubicles. This project also includes new site works and landscaping surrounding the pool and structures.
This project involves the construction of a new 6,400 sq ft Fire Station in Welland, ON.
This project includes the renovation of an interior space (approx. 425m2) and a vestibule addition (approx. 33m2) connecting the MCA Block with the Goodman School of Business building at Level 200 (ground floor). Interior scope of work includes architectural, electrical and mechanical modifications for new offices, multi-occupant spaces and corridors. Exterior scope of work includes selective removals, construction of steel framed vestibule, electrical and mechanical service installs (fed from existing sources), flooring, glazing and door installs, construction of concrete sidewalk and associated restoration.
This project involves interior modifications to Village Residence Courts 7 & 8. New flooring, new kitchen cabinetry and bathroom vanities, replacement of plumbing fixtures, painting, etc.
Replacement and servicing upgrades of the Halton Region Biosolids Management Centre including new Garage Building and all Architectural/Electrical/Mechanical/Structural and Civil design requirements.